Dubai – Shell Egypt announced on Sunday that production has officially commenced at the West Mina gas field, located in the North East El Amria concession area within the Mediterranean Sea. This development follows a rapid three-year timeline from the initial discovery of the reservoir to its operational launch.
The initiative is designed to significantly strengthen natural gas supplies for the local market while supporting broader national energy security objectives. The announcement was made by Shell Egypt, highlighting the strategic importance of this new asset in the country’s hydrocarbon portfolio.
Strategic Partnerships Accelerate Development
Dalia El Gabry, Vice Chairman and Chairperson of the Board of Directors for Shell companies in Egypt, stated that the commencement of production reflects the strength of partnerships among all parties involved. She emphasized the critical role of coordinated efforts during the early stages of the project to ensure timely execution.
El Gabry noted that collaboration with the Ministry of Petroleum and Mineral Resources, Egyptian Natural Gas Holding Company (EGAS), and Coflexip was instrumental in making necessary decisions to accelerate project implementation. These joint efforts helped achieve key milestones and meet production targets efficiently.
Infrastructure Integration and Output Capacity
West Mina Gas Company manages operations at the field, which has been connected to the Deep Western Delta pipeline network via a new seven-kilometer line transporting gas to the Burullus complex. Gas extracted from the field will be processed at Burullus before being injected into the national grid.
This integration allows for the utilization of existing infrastructure, thereby speeding up the delivery of new supplies to consumers. The field is expected to produce 160 million standard cubic feet of natural gas daily, representing its total output capacity as confirmed by company data.
Investment Decisions and Operational Structure
Shell had previously announced its final investment decision for the development of the West Mina field on June 30, 2025, following the completion of necessary studies and preparations. The project leverages existing infrastructure from the Deep Western Delta project, reducing construction time and avoiding the need for extensive new facilities.
Shell operates the project holding a 60% stake, while Coflexip Egypt Limited holds the remaining 40%. The development also involved coordination with Seabed 7 for engineering works and Baker Hughes for equipment supply, ensuring adherence to safety standards and risk management protocols throughout the process.
This story was produced in the newsroom from the disclosed sources named above.