{"id":253990,"date":"2026-08-30T14:53:12","date_gmt":"2026-08-30T11:53:12","guid":{"rendered":"https:\/\/www.bnreport.com\/alstom-open-first-phase\/"},"modified":"2026-08-30T14:53:12","modified_gmt":"2026-08-30T11:53:12","slug":"alstom-open-first-phase","status":"publish","type":"post","link":"https:\/\/www.bnreport.com\/en\/alstom-open-first-phase\/","title":{"rendered":"Alstom to Open First Phase of Alexandria Rail Hub in December With 20 Million Euro Investment"},"content":{"rendered":"<p>Rami Salah Eldin, the Country Manager for Alstom in Egypt, announced that the French multinational corporation intends to open the first phase of its railway industry complex located in Borg El Arab during December of next year. The inauguration of this initial stage is backed by an investment commitment of 20 million euros. This development represents a concrete step in the company\u2019s broader strategy to expand local manufacturing of railway components and systems within Egypt.<\/p>\n<h2>Project Scope and Initial Manufacturing Focus<\/h2>\n<p>The entire railway complex is situated on a land area spanning 40 feddans, with total projected investments reaching 80 million euros. According to Salah Eldin, the project aligns with Alstom\u2019s strategic objectives to localize the production of critical railway infrastructure. The first phase specifically focuses on establishing a specialized factory dedicated to producing electrical systems and various railway components. Key products from this initial stage will include signaling systems, electrical panels, control circuits, and electrical wiring harnesses.<\/p>\n<h2>Future Phases and Metro Line 6 Integration<\/h2>\n<p>Looking ahead, the second phase of the project is scheduled to commence the manufacturing of rolling stock. A primary focus of this upcoming stage will be the production of units designated for Line 6 of the Cairo Metro network. Salah Eldin emphasized that Alstom aims to execute the complete manufacturing process for these trains and their associated systems entirely within the Borg El Arab complex. This localization effort underscores the company&#8217;s commitment to integrating deeply into Egypt\u2019s public transport infrastructure projects.<\/p>\n<h2>Strategic Expansion and Regulatory Support<\/h2>\n<p>Beyond the immediate phases, Alstom has outlined a long-term plan to further expand the facility. The company intends to add nine additional feddans to the existing site, a move designed to increase production capacities and broaden the range of locally manufactured products and components. This expansion strategy is supported by recent regulatory developments; the Egyptian Cabinet recently approved an extension of the concession period granted to Alstom for the project. The tenure has been extended from 15 years to 30 years, providing the necessary stability to support increased investments and long-term operational planning.<\/p>\n<p>This timeline adjustment coincides with broader economic shifts and growing demand for industries linked to the transportation and railway sectors. The extended concession period is viewed as a critical enabler for Alstom to scale up its operations and fulfill its ambitious targets for local content in the Egyptian market. By securing a longer operational horizon, the company can better justify the capital expenditures required for advanced manufacturing technologies and workforce training, ensuring sustainable growth in the region&#8217;s rail sector.<\/p>\n<p><em>This story was produced in the newsroom from the disclosed sources named above.<\/em><\/p>\n<div class=\"share-bar\" dir=\"ltr\" style=\"margin:2em 0 .5em;padding:1.1em 0 .3em;border-top:1px solid rgba(128,128,128,.25);text-align:center\">\n<div style=\"font-size:.9em;opacity:.7;margin-bottom:.65em\">Share<\/div>\n<p><a href=\"https:\/\/wa.me\/?text=https%3A%2F%2Fwww.bnreport.com%2F%3Fp%3D253990\" target=\"_blank\" rel=\"noopener nofollow\" style=\"display:inline-block;padding:.55em 1.2em;margin:.25em;border-radius:999px;background:#25D366;color:#04342C;text-decoration:none;font-size:.92em;font-weight:600\">\u0648\u0627\u062a\u0633\u0627\u0628<\/a><a href=\"https:\/\/t.me\/share\/url?url=https%3A%2F%2Fwww.bnreport.com%2F%3Fp%3D253990\" target=\"_blank\" rel=\"noopener nofollow\" style=\"display:inline-block;padding:.55em 1.2em;margin:.25em;border-radius:999px;background:#229ED9;color:#042C53;text-decoration:none;font-size:.92em;font-weight:600\">\u062a\u0644\u062c\u0631\u0627\u0645<\/a><a href=\"https:\/\/www.facebook.com\/sharer\/sharer.php?u=https%3A%2F%2Fwww.bnreport.com%2F%3Fp%3D253990\" target=\"_blank\" rel=\"noopener nofollow\" style=\"display:inline-block;padding:.55em 1.2em;margin:.25em;border-radius:999px;background:#1877F2;color:#042C53;text-decoration:none;font-size:.92em;font-weight:600\">\u0641\u064a\u0633\u0628\u0648\u0643<\/a><a href=\"https:\/\/twitter.com\/intent\/tweet?url=https%3A%2F%2Fwww.bnreport.com%2F%3Fp%3D253990\" target=\"_blank\" rel=\"noopener nofollow\" style=\"display:inline-block;padding:.55em 1.2em;margin:.25em;border-radius:999px;background:#2C2C2A;color:#F1EFE8;text-decoration:none;font-size:.92em;font-weight:600\">\u0625\u0643\u0633<\/a><a href=\"https:\/\/www.bnreport.com\/?p=253990\" onclick=\"event.preventDefault();navigator.clipboard&#038;&#038;navigator.clipboard.writeText('https:\/\/www.bnreport.com\/?p=253990').then(function(){this.textContent='Copied \u2713'}.bind(this)).catch(function(){this.textContent='https:\/\/www.bnreport.com\/?p=253990'}.bind(this))||(this.textContent='https:\/\/www.bnreport.com\/?p=253990');return false\" style=\"display:inline-block;padding:.55em 1.2em;margin:.25em;border-radius:999px;background:transparent;color:inherit;border:1.5px solid currentColor;opacity:.75;text-decoration:none;font-size:.92em;font-weight:600;cursor:pointer\">Copy link<\/a><\/div>\n","protected":false},"excerpt":{"rendered":"<p>French rail giant Alstom has confirmed plans to inaugurate the first phase of its railway manufacturing complex in Borg El Arab by December, marking a significant expansion of local production capabilities with an initial investment of 20 million euros.<\/p>\n","protected":false},"author":17,"featured_media":253986,"comment_status":"closed","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[43],"tags":[],"class_list":["post-253990","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Alstom to Open First Phase of Alexandria Rail Hub in December With 20 Million Euro Investment - Business News Report<\/title>\n<meta name=\"description\" content=\"French rail giant Alstom has confirmed plans to inaugurate the first phase of its railway manufacturing complex in Borg El Arab by December, marking a significant expansion of local production capabilities with an initial investment of 20 million euros.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.bnreport.com\/en\/alstom-open-first-phase\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Alstom to Open First Phase of Alexandria Rail Hub in December With 20 Million Euro Investment - Business News Report\" \/>\n<meta property=\"og:description\" content=\"French rail giant Alstom has confirmed plans to inaugurate the first phase of its railway manufacturing complex in Borg El Arab by December, marking a significant expansion of local production capabilities with an initial investment of 20 million euros.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.bnreport.com\/en\/alstom-open-first-phase\/\" \/>\n<meta property=\"og:site_name\" content=\"Business News Report\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Business-NewsReport-328225811095934\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-30T11:53:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.bnreport.com\/wp-content\/uploads\/2026\/08\/l-6032-10-.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"670\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Newsroom\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@BNReport\" \/>\n<meta name=\"twitter:site\" content=\"@BNReport\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Newsroom\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/alstom-open-first-phase\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/alstom-open-first-phase\\\/\"},\"author\":{\"name\":\"Newsroom\",\"@id\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/#\\\/schema\\\/person\\\/2b474d602e1adc00e1e307a0509004a2\"},\"headline\":\"Alstom to Open First Phase of Alexandria Rail Hub in December With 20 Million Euro Investment\",\"datePublished\":\"2026-08-30T11:53:12+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/alstom-open-first-phase\\\/\"},\"wordCount\":452,\"publisher\":{\"@id\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/alstom-open-first-phase\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.bnreport.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/l-6032-10-.jpg\",\"articleSection\":[\"Business\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/alstom-open-first-phase\\\/\",\"url\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/alstom-open-first-phase\\\/\",\"name\":\"Alstom to Open First Phase of Alexandria Rail Hub in December With 20 Million Euro Investment - Business News Report\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/alstom-open-first-phase\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/alstom-open-first-phase\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.bnreport.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/l-6032-10-.jpg\",\"datePublished\":\"2026-08-30T11:53:12+00:00\",\"description\":\"French rail giant Alstom has confirmed plans to inaugurate the first phase of its railway manufacturing complex in Borg El Arab by December, marking a significant expansion of local production capabilities with an initial investment of 20 million euros.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/alstom-open-first-phase\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.bnreport.com\\\/en\\\/alstom-open-first-phase\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/alstom-open-first-phase\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.bnreport.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/l-6032-10-.jpg\",\"contentUrl\":\"https:\\\/\\\/www.bnreport.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/l-6032-10-.jpg\",\"width\":1200,\"height\":670,\"caption\":\"\u0623\u0644\u0633\u062a\u0648\u0645 \u062a\u062e\u0637\u0637 \u0644\u0627\u0641\u062a\u062a\u0627\u062d \u0627\u0644\u0645\u0631\u062d\u0644\u0629 \u0627\u0644\u0623\u0648\u0644\u0649 \u0645\u0646 \u0645\u062c\u0645\u0639 \u0627\u0644\u0633\u0643\u0643 \u0627\u0644\u062d\u062f\u064a\u062f\u064a\u0629 \u0628\u0628\u0631\u062c \u0627\u0644\u0639\u0631\u0628 \u0641\u064a \u062f\u064a\u0633\u0645\u0628\u0631\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/alstom-open-first-phase\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629\",\"item\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Alstom to Open First Phase of Alexandria Rail Hub in December With 20 Million Euro Investment\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/\",\"name\":\"Business News Report\",\"description\":\"\u0623\u062e\u0628\u0627\u0631 \u0627\u0644\u0627\u0642\u062a\u0635\u0627\u062f \u0648\u0627\u0644\u0623\u0639\u0645\u0627\u0644 \u2014 \u0627\u0644\u0623\u0633\u0648\u0627\u0642 \u0648\u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0648\u0627\u0644\u0637\u0627\u0642\u0629 \u0641\u064a \u0627\u0644\u062e\u0644\u064a\u062c \u0648\u0627\u0644\u0639\u0627\u0644\u0645\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/#organization\",\"name\":\"\u0628\u0632\u0646\u0633 \u0631\u064a\u0628\u0648\u0631\u062a \u0627\u0644\u0627\u062e\u0628\u0627\u0631\u064a\",\"url\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.bnreport.com\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/LOGO2.png\",\"contentUrl\":\"https:\\\/\\\/www.bnreport.com\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/LOGO2.png\",\"width\":200,\"height\":50,\"caption\":\"\u0628\u0632\u0646\u0633 \u0631\u064a\u0628\u0648\u0631\u062a \u0627\u0644\u0627\u062e\u0628\u0627\u0631\u064a\"},\"image\":{\"@id\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/Business-NewsReport-328225811095934\\\/\",\"https:\\\/\\\/x.com\\\/BNReport\",\"https:\\\/\\\/www.instagram.com\\\/business.newsreport\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/#\\\/schema\\\/person\\\/2b474d602e1adc00e1e307a0509004a2\",\"name\":\"Newsroom\",\"description\":\"Stories that do not fall under a single desk. An editorial desk name, not an individual \u2014 see the editorial team page.\",\"url\":\"https:\\\/\\\/www.bnreport.com\\\/en\\\/author\\\/bnr-desk-en\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Alstom to Open First Phase of Alexandria Rail Hub in December With 20 Million Euro Investment - Business News Report","description":"French rail giant Alstom has confirmed plans to inaugurate the first phase of its railway manufacturing complex in Borg El Arab by December, marking a significant expansion of local production capabilities with an initial investment of 20 million euros.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.bnreport.com\/en\/alstom-open-first-phase\/","og_locale":"en_US","og_type":"article","og_title":"Alstom to Open First Phase of Alexandria Rail Hub in December With 20 Million Euro Investment - Business News Report","og_description":"French rail giant Alstom has confirmed plans to inaugurate the first phase of its railway manufacturing complex in Borg El Arab by December, marking a significant expansion of local production capabilities with an initial investment of 20 million euros.","og_url":"https:\/\/www.bnreport.com\/en\/alstom-open-first-phase\/","og_site_name":"Business News Report","article_publisher":"https:\/\/www.facebook.com\/Business-NewsReport-328225811095934\/","article_published_time":"2026-08-30T11:53:12+00:00","og_image":[{"width":1200,"height":670,"url":"https:\/\/www.bnreport.com\/wp-content\/uploads\/2026\/08\/l-6032-10-.jpg","type":"image\/jpeg"}],"author":"Newsroom","twitter_card":"summary_large_image","twitter_creator":"@BNReport","twitter_site":"@BNReport","twitter_misc":{"Written by":"Newsroom","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.bnreport.com\/en\/alstom-open-first-phase\/#article","isPartOf":{"@id":"https:\/\/www.bnreport.com\/en\/alstom-open-first-phase\/"},"author":{"name":"Newsroom","@id":"https:\/\/www.bnreport.com\/en\/#\/schema\/person\/2b474d602e1adc00e1e307a0509004a2"},"headline":"Alstom to Open First Phase of Alexandria Rail Hub in December With 20 Million Euro Investment","datePublished":"2026-08-30T11:53:12+00:00","mainEntityOfPage":{"@id":"https:\/\/www.bnreport.com\/en\/alstom-open-first-phase\/"},"wordCount":452,"publisher":{"@id":"https:\/\/www.bnreport.com\/en\/#organization"},"image":{"@id":"https:\/\/www.bnreport.com\/en\/alstom-open-first-phase\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bnreport.com\/wp-content\/uploads\/2026\/08\/l-6032-10-.jpg","articleSection":["Business"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.bnreport.com\/en\/alstom-open-first-phase\/","url":"https:\/\/www.bnreport.com\/en\/alstom-open-first-phase\/","name":"Alstom to Open First Phase of Alexandria Rail Hub in December With 20 Million Euro Investment - Business News Report","isPartOf":{"@id":"https:\/\/www.bnreport.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.bnreport.com\/en\/alstom-open-first-phase\/#primaryimage"},"image":{"@id":"https:\/\/www.bnreport.com\/en\/alstom-open-first-phase\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bnreport.com\/wp-content\/uploads\/2026\/08\/l-6032-10-.jpg","datePublished":"2026-08-30T11:53:12+00:00","description":"French rail giant Alstom has confirmed plans to inaugurate the first phase of its railway manufacturing complex in Borg El Arab by December, marking a significant expansion of local production capabilities with an initial investment of 20 million euros.","breadcrumb":{"@id":"https:\/\/www.bnreport.com\/en\/alstom-open-first-phase\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.bnreport.com\/en\/alstom-open-first-phase\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bnreport.com\/en\/alstom-open-first-phase\/#primaryimage","url":"https:\/\/www.bnreport.com\/wp-content\/uploads\/2026\/08\/l-6032-10-.jpg","contentUrl":"https:\/\/www.bnreport.com\/wp-content\/uploads\/2026\/08\/l-6032-10-.jpg","width":1200,"height":670,"caption":"\u0623\u0644\u0633\u062a\u0648\u0645 \u062a\u062e\u0637\u0637 \u0644\u0627\u0641\u062a\u062a\u0627\u062d \u0627\u0644\u0645\u0631\u062d\u0644\u0629 \u0627\u0644\u0623\u0648\u0644\u0649 \u0645\u0646 \u0645\u062c\u0645\u0639 \u0627\u0644\u0633\u0643\u0643 \u0627\u0644\u062d\u062f\u064a\u062f\u064a\u0629 \u0628\u0628\u0631\u062c \u0627\u0644\u0639\u0631\u0628 \u0641\u064a \u062f\u064a\u0633\u0645\u0628\u0631"},{"@type":"BreadcrumbList","@id":"https:\/\/www.bnreport.com\/en\/alstom-open-first-phase\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629","item":"https:\/\/www.bnreport.com\/en\/"},{"@type":"ListItem","position":2,"name":"Alstom to Open First Phase of Alexandria Rail Hub in December With 20 Million Euro Investment"}]},{"@type":"WebSite","@id":"https:\/\/www.bnreport.com\/en\/#website","url":"https:\/\/www.bnreport.com\/en\/","name":"Business News Report","description":"\u0623\u062e\u0628\u0627\u0631 \u0627\u0644\u0627\u0642\u062a\u0635\u0627\u062f \u0648\u0627\u0644\u0623\u0639\u0645\u0627\u0644 \u2014 \u0627\u0644\u0623\u0633\u0648\u0627\u0642 \u0648\u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0648\u0627\u0644\u0637\u0627\u0642\u0629 \u0641\u064a \u0627\u0644\u062e\u0644\u064a\u062c \u0648\u0627\u0644\u0639\u0627\u0644\u0645","publisher":{"@id":"https:\/\/www.bnreport.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.bnreport.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.bnreport.com\/en\/#organization","name":"\u0628\u0632\u0646\u0633 \u0631\u064a\u0628\u0648\u0631\u062a \u0627\u0644\u0627\u062e\u0628\u0627\u0631\u064a","url":"https:\/\/www.bnreport.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bnreport.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.bnreport.com\/wp-content\/uploads\/2020\/12\/LOGO2.png","contentUrl":"https:\/\/www.bnreport.com\/wp-content\/uploads\/2020\/12\/LOGO2.png","width":200,"height":50,"caption":"\u0628\u0632\u0646\u0633 \u0631\u064a\u0628\u0648\u0631\u062a \u0627\u0644\u0627\u062e\u0628\u0627\u0631\u064a"},"image":{"@id":"https:\/\/www.bnreport.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Business-NewsReport-328225811095934\/","https:\/\/x.com\/BNReport","https:\/\/www.instagram.com\/business.newsreport"]},{"@type":"Person","@id":"https:\/\/www.bnreport.com\/en\/#\/schema\/person\/2b474d602e1adc00e1e307a0509004a2","name":"Newsroom","description":"Stories that do not fall under a single desk. An editorial desk name, not an individual \u2014 see the editorial team page.","url":"https:\/\/www.bnreport.com\/en\/author\/bnr-desk-en\/"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.bnreport.com\/en\/wp-json\/wp\/v2\/posts\/253990","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bnreport.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bnreport.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bnreport.com\/en\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bnreport.com\/en\/wp-json\/wp\/v2\/comments?post=253990"}],"version-history":[{"count":1,"href":"https:\/\/www.bnreport.com\/en\/wp-json\/wp\/v2\/posts\/253990\/revisions"}],"predecessor-version":[{"id":253991,"href":"https:\/\/www.bnreport.com\/en\/wp-json\/wp\/v2\/posts\/253990\/revisions\/253991"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bnreport.com\/en\/wp-json\/wp\/v2\/media\/253986"}],"wp:attachment":[{"href":"https:\/\/www.bnreport.com\/en\/wp-json\/wp\/v2\/media?parent=253990"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bnreport.com\/en\/wp-json\/wp\/v2\/categories?post=253990"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bnreport.com\/en\/wp-json\/wp\/v2\/tags?post=253990"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}